The subject of the contract are the construction works involved in the expansion of the liquefied natural gas regasification terminal in Świnoujście, covering the following three project components: SCV Project, Railway Siding Project and Tank Project under the EPC contract formula.
The scope of the Contractor’s accountability includes
- the design of all facilities and installations (development of Building Designs and Detailed Engineering Designs) along with obtaining construction permits;
- setting up the construction site / construction facilities;procurement and delivery of equipment and materials;
- performance of construction and installation works;
- integration of the designed facilities / installations with the existing infrastructure, process and control systems and control and safety systems;
- development and submission of as-built documentation to the Awarding Entity; commissioning with handover to operations;
- obtaining the use permit, training the operating personnel;
- delivery of spare parts(for 2 years) and warranty service during the warranty period.