The subject of the contract are the construction works involved in the expansion of the liquefied natural gas regasification terminal in Świnoujście, covering the following three project components: SCV Project, Railway Siding Project and Tank Project under the EPC contract formula.

The scope of the Contractor’s accountability includes

  • the design of all facilities and installations (development of Building Designs and Detailed Engineering Designs) along with obtaining construction permits;
  • setting up the construction site / construction facilities;procurement and delivery of equipment and materials;
  • performance of construction and installation works;
  • integration of the designed facilities / installations with the existing infrastructure, process and control systems and control and safety systems;
  • development and submission of as-built documentation to the Awarding Entity; commissioning with handover to operations;
  • obtaining the use permit, training the operating personnel;
  • delivery of spare parts(for 2 years) and warranty service during the warranty period.

 

 